Knowledge Search
Refine results
- ReportProject DocumentsConfidential
Coastal Drainage Study — Catchment Remodelling
Surcharging observed in the northern corniche catchment during the 2021 event; recommends attenuation storage and revised outfall invert levels.
Relevance0.96 - ReportProject DocumentsConfidential
Geotechnical Interpretive Report — Reclaimed Zone
Interpretive Report · 168 pp · geotechnical, reclaimed ground, boreholes
Relevance0.95 - ReportProject DocumentsConfidential
Flood Risk Assessment — Corniche Catchments
Assessment · 96 pp · flood risk, hydrology
Relevance0.94 - ReportProject DocumentsConfidential
Shoreline Protection Design Basis, Rev C
Design Basis · 74 pp · shoreline protection, coastal
Relevance0.93Jeddah Coastal Development Jeddah, Saudi ArabiaCoastal30 Mar 2022Owner: Coastal Engineering Practice - ReportProject DocumentsConfidential
Outfall Hydraulic Modelling Technical Note
Technical Note · 32 pp · hydraulic modelling, outfalls
Relevance0.92 - ReportProject DocumentsInternal
Doha Infrastructure Hydrology Report — Coastal Outfalls
Coastal outfalls along the Corniche interceptor were shown to tide-lock for up to 4 hours during spring tides coincident with peak rainfall.
Relevance0.87 - ReportProject DocumentsInternal
City-Wide Surface Water Network — Catchment Remodelling
Technical Report · 126 pp · surface water, 42 catchments
Relevance0.86 - ReportProject DocumentsConfidential
Abu Dhabi Coastal Assessment
Shoreline retreat of 0.8–1.4 m/yr was measured across the assessed frontage between 2009 and 2018.
Relevance0.84Abu Dhabi Airport Development Abu Dhabi, United Arab EmiratesCoastal18 Nov 2019Owner: Coastal Engineering Practice - ReportProject DocumentsInternal
Shoreline Change Imagery Analysis 2015–2022
Assessment · 52 pp · shoreline change, erosion
Relevance0.80 - ReportProject DocumentsInternal
Interim Drainage Strategy — Port District
Technical Note · 38 pp · drainage strategy, port district
Relevance0.79 - ReportProject DocumentsInternal
Recurring Surcharge at Tide-Locked Outfalls — Issue Record
Issue record linking surge levels to reduced conveyance; resolution adopted non-return valves and storage.
Relevance0.74 - ReportProject DocumentsInternal
Cyclone-Driven Surge Modelling Report
Technical Report · 134 pp · cyclone, surge modelling
Relevance0.73 - ReportProject DocumentsInternal
Revetment and Breakwater Design Basis
Design Basis · 82 pp · revetment, breakwater
Relevance0.72 - ReportProject DocumentsInternal
Irwell Corridor Flood Resilience Assessment
Assessment · 78 pp · flood resilience, corridor
Relevance0.71Manchester Rail Interchange Manchester, United KingdomDrainage11 Feb 2020Owner: Water & Environment — UK - Data AssetProject DocumentsInternal
Track Drainage Renewal Bill of Quantities
Bill of Quantities · 22 pp · track drainage, BoQ
Relevance0.69 - DrawingProject DocumentsPublic
Public Realm Drainage Coordination Drawings
Drawing · 34 pp · public realm, drainage coordination
Relevance0.67Lisbon Transit-Oriented Districts Lisbon, PortugalUrban Planning09 Oct 2021Owner: Urban Planning — Portugal - ReportProject DocumentsInternal
Coastal Flood Resilience Assessment — Metropolitan Network
Assessment · 88 pp · flood resilience, coastal
Relevance0.62Dar es Salaam Water Resilience Dar es Salaam, TanzaniaCoastal19 Apr 2021Owner: Water & Environment — Tanzania - DrawingProject DocumentsInternal
Surface Water Network — Sheet 4 of 18
Deep tunnel alignment and shaft locations with hydraulic long-sections.
Relevance0.60Dubai Urban Drainage Upgrade Dubai, United Arab EmiratesDrainage11 Nov 2022Owner: Infrastructure — UAE - ReportProject DocumentsInternal
Coastal Outfall Capacity Review
Technical Report · 84 pp · outfall capacity, coastal districts
Relevance0.60Dubai Urban Drainage Upgrade Dubai, United Arab EmiratesHydrology08 Aug 2022Owner: Water & Environment — UAE - ReportProject DocumentsInternal
Catchment Remodelling Technical Note
Technical Note · 40 pp · catchment remodelling
Relevance0.60Dubai Urban Drainage Upgrade Dubai, United Arab EmiratesDrainage30 Jan 2021Owner: Infrastructure — UAE - ReportProject DocumentsInternal
Deep Tunnel Stormwater Strategy Design Basis
Design Basis · 58 pp · stormwater strategy, deep tunnel
Relevance0.60Dubai Urban Drainage Upgrade Dubai, United Arab EmiratesHighways17 Feb 2020Owner: Infrastructure — UAE - ImageProject DocumentsInternal
Shoreline change imagery 2015–2022
Orthorectified aerial series used for erosion rate estimation along 3.4 km of seafront.
Relevance0.81 - ImageProject DocumentsInternal
Site progress photography — North Corniche
1,840 geotagged construction progress images across the shoreline protection works.
Relevance0.79 - ProjectProject DocumentsConfidential
Jeddah Coastal Development
A 14 km waterfront regeneration covering shoreline protection, stormwater drainage upgrades and mixed-use district infrastructure. Includes extensive geotechnical investigation across reclaimed ground and a revised drainage catchment model after the 2021 rainfall events.
Relevance0.94 - ProjectProject DocumentsInternal
Doha Infrastructure Program
City-wide roads, surface water drainage and foul network program including hydrological modelling of 42 catchments and coastal outfall design.
Relevance0.92 - ProjectProject DocumentsConfidential
Abu Dhabi Airport Development
Terminal expansion, airside pavement rehabilitation and coastal groundwater assessment adjacent to the runway apron.
Relevance0.90Abu Dhabi Airport Development Abu Dhabi, United Arab EmiratesAviationFeb 2014 – Dec 2019Owner: S. Farouk - ProjectProject DocumentsInternal
Beirut Waterfront Masterplan
Masterplan for 220 hectares of seafront including coastal erosion mitigation, public realm and interim drainage strategy for the port district.
Relevance0.89 - ProjectProject DocumentsInternal
Muscat Coastal Protection Scheme
Revetment and breakwater works with cyclone-driven surge modelling and urban drainage interface studies.
Relevance0.87 - ProjectProject DocumentsInternal
Manchester Rail Interchange
Station concourse remodelling, track drainage renewal and flood resilience assessment for the Irwell corridor.
Relevance0.86 - ProjectProject DocumentsPublic
Lisbon Transit-Oriented Districts
Mixed-use districts around three metro nodes, with sustainability-led building services and public realm drainage.
Relevance0.84 - ProjectProject DocumentsInternal
Dar es Salaam Water Resilience
Coastal flood resilience, stormwater conveyance and non-revenue water reduction across the metropolitan network.
Relevance0.82 - ProjectProject DocumentsInternal
Dubai Urban Drainage Upgrade
Deep tunnel stormwater strategy, catchment remodelling and coastal outfall capacity review for coastal districts.
Relevance0.81 - GIS LayerClient MapsInternal
Coastal Catchment Boundaries — Red Sea Corridor
PostGIS table · EPSG:32637 · 214 features · Dar-produced
Relevance0.92 - GIS LayerClient MapsConfidential
Borehole Locations — North Corniche
GeoPackage · EPSG:4326 · 412 features · Dar-produced
Relevance0.91 - GIS LayerClient MapsInternal
Shoreline Change 2015–2022
Shapefile · EPSG:32637 · 8 features · Client-provided
Relevance0.89Jeddah Coastal Development Jeddah, Saudi ArabiaGIS30 Jan 2022Owner: Jeddah Development & Urban Regeneration Co. - GIS LayerClient MapsInternal
City-Wide Drainage Catchments
PostGIS table · EPSG:32639 · 42 features · Dar-produced
Relevance0.85 - GIS LayerClient MapsInternal
Revetment and Breakwater Alignment
PostGIS table · EPSG:32640 · 6 features · Dar-produced
Relevance0.75 - GIS LayerClient MapsInternal
Track Drainage Asset Register
GeoPackage · EPSG:27700 · 96 features · Client-provided
Relevance0.72 - GIS LayerClient MapsInternal
Deep Tunnel Alignment and Shaft Locations
PostGIS table · EPSG:32640 · 1 features · Dar-produced
Relevance0.65 - GIS LayerClient MapsInternal
GIS Project Boundaries
PostGIS table · EPSG:4326 · 4,102 features · Dar-produced
Relevance0.64 - Market SignalMarket SignalsPublic
Red Sea shipping delays extend cement clinker lead times
Container and bulk carrier rerouting around the Cape of Good Hope is adding 2-3 weeks to clinker and bagged cement shipments into Red Sea ports.
Relevance0.86 - Market SignalMarket SignalsPublic
Contractors on LinkedIn flag aggregate shortages across UAE coastal projects
Site engineers report difficulty securing washed aggregate for coastal concrete works, with multiple contractors posting sourcing requests.
Relevance0.81 - Market SignalMarket SignalsPublic
X thread: engineers debate aggregate quality on reclaimed Gulf sites
Informal discussion on aggregate grading consistency from newer quarry sources supplying reclaimed-ground coastal projects.
Relevance0.70 - RecommendationMarket SignalsConfidential
Escalate to client — Steel rebar
Jeddah Coastal Development's remaining reinforcement package is exposed to the same rebar escalation without a price adjustment clause. Recommend raising a commercial variance discussion at the next client review.
Relevance0.84Jeddah Coastal Development Jeddah, Saudi ArabiaSteel rebarThis quarterOwner: C. Ribeiro — Account Director - RecommendationMarket SignalsConfidential
Hold — Cement
Cement is down 1.2% over 30 days with demand softening in several source markets. No action recommended; continue standard call-off scheduling.
Relevance0.80 - RecommendationMarket SignalsConfidential
Pre-buy — Aggregates
Coastal concrete aggregate sourcing is tightening across UAE with a 4.6% price rise in 30 days. Recommend securing Dubai Urban Drainage's remaining tunnel-lining concrete aggregate ahead of the Q4 pour programme.
Relevance0.78Dubai Urban Drainage Upgrade Dubai, United Arab EmiratesAggregatesThis quarterOwner: F. Rahman — Head of Procurement - DecisionMarket SignalsInternal
Continue standard cement call-off scheduling
Cement pricing has eased 1.2% over 30 days as source-market demand softens. No forward-buy action is justified; standard scheduling continues across affected projects.
Relevance0.80Jeddah Coastal Development Jeddah, Saudi ArabiaProcurement02 Aug 2026Owner: F. Rahman — Head of Procurement