Knowledge Search
Refine results
- ReportProject DocumentsConfidential
Coastal Drainage Study — Catchment Remodelling
Surcharging observed in the northern corniche catchment during the 2021 event; recommends attenuation storage and revised outfall invert levels.
Relevance0.96 - ReportProject DocumentsConfidential
Geotechnical Interpretive Report — Reclaimed Zone
Interpretive Report · 168 pp · geotechnical, reclaimed ground, boreholes
Relevance0.95 - ReportProject DocumentsConfidential
Flood Risk Assessment — Corniche Catchments
Assessment · 96 pp · flood risk, hydrology
Relevance0.94 - ReportProject DocumentsConfidential
Shoreline Protection Design Basis, Rev C
Design Basis · 74 pp · shoreline protection, coastal
Relevance0.93Jeddah Coastal Development Jeddah, Saudi ArabiaCoastal30 Mar 2022Owner: Coastal Engineering Practice - ReportProject DocumentsConfidential
Outfall Hydraulic Modelling Technical Note
Technical Note · 32 pp · hydraulic modelling, outfalls
Relevance0.92 - ReportProject DocumentsInternal
Irwell Corridor Flood Resilience Assessment
Assessment · 78 pp · flood resilience, corridor
Relevance0.71Manchester Rail Interchange Manchester, United KingdomDrainage11 Feb 2020Owner: Water & Environment — UK - ReportProject DocumentsInternal
Coastal Flood Resilience Assessment — Metropolitan Network
Assessment · 88 pp · flood resilience, coastal
Relevance0.62Dar es Salaam Water Resilience Dar es Salaam, TanzaniaCoastal19 Apr 2021Owner: Water & Environment — Tanzania - ImageProject DocumentsInternal
Site progress photography — North Corniche
1,840 geotagged construction progress images across the shoreline protection works.
Relevance0.79 - ProjectProject DocumentsConfidential
Jeddah Coastal Development
A 14 km waterfront regeneration covering shoreline protection, stormwater drainage upgrades and mixed-use district infrastructure. Includes extensive geotechnical investigation across reclaimed ground and a revised drainage catchment model after the 2021 rainfall events.
Relevance0.94 - ProjectProject DocumentsInternal
Muscat Coastal Protection Scheme
Revetment and breakwater works with cyclone-driven surge modelling and urban drainage interface studies.
Relevance0.87 - ProjectProject DocumentsInternal
Manchester Rail Interchange
Station concourse remodelling, track drainage renewal and flood resilience assessment for the Irwell corridor.
Relevance0.86 - ProjectProject DocumentsInternal
Dar es Salaam Water Resilience
Coastal flood resilience, stormwater conveyance and non-revenue water reduction across the metropolitan network.
Relevance0.82 - GIS LayerClient MapsInternal
Coastal Catchment Boundaries — Red Sea Corridor
PostGIS table · EPSG:32637 · 214 features · Dar-produced
Relevance0.92 - GIS LayerClient MapsConfidential
Borehole Locations — North Corniche
GeoPackage · EPSG:4326 · 412 features · Dar-produced
Relevance0.91 - GIS LayerClient MapsInternal
Shoreline Change 2015–2022
Shapefile · EPSG:32637 · 8 features · Client-provided
Relevance0.89Jeddah Coastal Development Jeddah, Saudi ArabiaGIS30 Jan 2022Owner: Jeddah Development & Urban Regeneration Co. - GIS LayerClient MapsInternal
Wadi Crossing Points and Flood Extents
GeoTIFF · EPSG:32636 · 14 features · Third-party / Open · validation pending
Relevance0.77NEOM Water Transmission Corridor Tabuk, Saudi ArabiaGIS12 Mar 2022Owner: National hydrology agency (open data) - GIS LayerClient MapsPublic
Irwell Corridor Flood Extent
Shapefile · EPSG:27700 · 4 features · Third-party / Open
Relevance0.74Manchester Rail Interchange Manchester, United KingdomGIS11 Feb 2020Owner: UK Environment Agency (open data) - GIS LayerClient MapsInternal
GIS Project Boundaries
PostGIS table · EPSG:4326 · 4,102 features · Dar-produced
Relevance0.64 - Market SignalMarket SignalsPublic
Red Sea shipping delays extend cement clinker lead times
Container and bulk carrier rerouting around the Cape of Good Hope is adding 2-3 weeks to clinker and bagged cement shipments into Red Sea ports.
Relevance0.86 - Market SignalMarket SignalsPublic
X thread: engineers debate aggregate quality on reclaimed Gulf sites
Informal discussion on aggregate grading consistency from newer quarry sources supplying reclaimed-ground coastal projects.
Relevance0.70 - RecommendationMarket SignalsConfidential
Escalate to client — Steel rebar
Jeddah Coastal Development's remaining reinforcement package is exposed to the same rebar escalation without a price adjustment clause. Recommend raising a commercial variance discussion at the next client review.
Relevance0.84Jeddah Coastal Development Jeddah, Saudi ArabiaSteel rebarThis quarterOwner: C. Ribeiro — Account Director - RecommendationMarket SignalsConfidential
Hold — Cement
Cement is down 1.2% over 30 days with demand softening in several source markets. No action recommended; continue standard call-off scheduling.
Relevance0.80 - DecisionMarket SignalsInternal
Continue standard cement call-off scheduling
Cement pricing has eased 1.2% over 30 days as source-market demand softens. No forward-buy action is justified; standard scheduling continues across affected projects.
Relevance0.80Jeddah Coastal Development Jeddah, Saudi ArabiaProcurement02 Aug 2026Owner: F. Rahman — Head of Procurement - DecisionProject DocumentsInternal
Confirm CRS for NEOM wadi crossing flood extent layer
The open-data wadi crossing and flood extent layer sourced from the national hydrology agency is missing CRS metadata; EPSG:32636 has been assumed pending confirmation. Wadi crossing flood risk assessments should not be finalised on this layer until confirmed.
Relevance0.69